Facilities — April 26, 2000 — NEC New Fab Construction to Double Capacity

TOKYO, JAPAN—NEC will spend $2.9 billion to build two 300-mm, 12-inch wafer fabs. The construction will occur simultaneously and will double the company's semiconductor manufacturing capacity.

By Stephanie Levy

POST A COMMENT

Easily post a comment below using your Linkedin, Twitter, Google or Facebook account. Comments won't automatically be posted to your social media accounts unless you select to share.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

LIVE NEWS FEED

NEW PRODUCTS

Compact point of use fluid delivery heater replaces multiple components in a system
07/22/2015Watlow, a designer and manufacturer of complete thermal systems, announces its new point-of-use fluid delivery heater...
New fiber optic temperature sensing and control system ideal for RF environments
07/22/2015Watlow, a designer and manufacturer of complete thermal systems, announced its new EZ-ZONE RM fiber optic temperature me...