M+W Zander picked to build GF’s Fab2

October 13, 2009 – GlobalFoundries has signed a &euro550M contract with M+W Zander to engineer and build its Fab 2 300mm/28nm wafer facility in New York State.

The "full turnkey" deal covers everything about the site’s construction, from architectural and engineering services to construction management for the whole project, and general contracting for technical areas (manufacturing spaces, building utilities, central utility, and process systems).

Click to Enlarge
Source: Fab2construction.com

The site will incorporate four major buildings with combined >130,000 sq. m, including 28,000 sq. m of Class 100 cleanroom wafer fab. Construction is slated to take about two years, plus 12-18mos to ramp to full operating mode, to meet a 2012 production startup time.

Milestones for the fledgling Fab2 construction, reached so far this year:

– June 15: Site work start. Clearing, grubbing and grading operations initiated. Final site plan application approvals received from the Towns of Malta and Stillwater.
– July 24: Groundbreaking ceremony, with local and state officials including Governor Patterson.
– August 21: Building permits issued for Fab/spine and central utilities building.
– August 28: Construction begins of temporary office building for management and support staff.
– September 9: – Initial 2500 cubic yd. foundation poured, using material from on-site concrete batch plant.

Click to Enlarge
Architectural drawing of Fab 2, Module 1. (Source: GlobalFoundries)

 

POST A COMMENT

Easily post a comment below using your Linkedin, Twitter, Google or Facebook account. Comments won't automatically be posted to your social media accounts unless you select to share.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

LIVE NEWS FEED

NEW PRODUCTS

Novel Wafer Analyzer for up to 300mm wafer using high speed Raman Imaging Technology
08/08/2016Nanophoton introduces RAMANdrive - a new Wafer Analyzer - for a wide range of applications at semiconductor market a...
Pfeiffer Vacuum introduces HiPace 2800 turbopump for ion implantation applications
07/06/2016Pfeiffer Vacuum has introduced the HiPace 2800 IT turbopump that is designed for ion implantation applications....
NanoFocus AG introduces new inspection system for semiconductors industry
05/31/2016NanoFocus AG, the developer and manufacturer of optical 3D surface measuring technology, introduces the new measuring system µ...