2012 ITRS update: Back-end packaging and MEMS

July 13, 2012 — At SEMICON West 2012, this week in San Francisco, CA, the working groups of the International Technology Roadmap for Semiconductors (ITRS) held 3 sessions (TechXPOTs) outlining 2012 updates to the roadmap. Check out the updates to the front-end, scaling roadmap working groups here.

The ITRS undergoes major revisions on odd-numbered years. 2012 being an even-numbered year, very little change occurred to the Overall Roadmap Technology Characteristics (ORTC). However, within the working groups, some updates were worth noting.

Also read: 2011 ITRS: DRAM, 3D Flash, MEMS, nano-scaling steal the show

First, the changes to the ORTC, presented at the TechXPOT by Bob Doering. Of interest were changes focused directly or indirectly on 450mm. ITRS has moved the forecast production start date to 2015-2016. The definition of

POST A COMMENT

Easily post a comment below using your Linkedin, Twitter, Google or Facebook account. Comments won't automatically be posted to your social media accounts unless you select to share.

Leave a Reply

Your email address will not be published. Required fields are marked *

NEW PRODUCTS

Introducing Semiconductor Digest
04/30/2019Semiconductor Digest is a new magazine dedicated to the worldwide semiconductor industry...
KLA-Tencor announces new defect inspection systems
07/12/2018KLA-Tencor Corporation announced two new defect inspection products at SEMICON West this week, addressing two key challenges in tool and process monit...
3D-Micromac unveils laser-based high-volume sample preparation solution for semiconductor failure analysis
07/09/2018microPREP 2.0 provides order of magnitude time and cost savings compared to traditional sample...